The flight campaign was conducted from Talagi Airport in Arkhangelsk between March 12 and 30 and aims for certification of the three commercial aircraft in 2026
In addition to the last SuperJets with Western components, a single Tupolev Tu-214 was delivered. Series production of new jets is expected in 2026 after several delays
The aircraft are being equipped with domestically developed engines to replace Western turbofans, as well as receiving domestic avionics and other equipment